Work Commences at Trail Creek Crossing!

Work has commenced on the construction of Trail Creek Crossing's first building.

Contractors began with the installation of Erosion and Sediment controls including silt fence and wattles. These controls are required by the Environment Protection Agency, and are used to prevent construction debris from contaminating nearby waterways.



Large equipment is being used to remove surface growth material and top soil in preparation for the detailed excavation of foundations.